For the second year in a row the number of wind turbines granted permission in county Donegal (24) was lower than the number refused (52).  This is a continuation of a significant trend for such decisions; with the total number of turbines refused permission in 2016 (52) being just one more than the combined total (51) of refusals for the two prior years 2014 and 2015.

Wind turbine permissions for Donegal, per year

Decision/Year

2012 2013 2014 2015 2016

Granted

87 67 94 11

24

Refused

5 7 19 32

52

Withdrawn   1 4

 

Detail in relation to wind farm and ancillary development decisions

There were a total of 31 planning determinations, dealing with wind farms and ancillary developments in Donegal concluded during 2016.  Of these applications six were deemed invalid by Donegal County Council.  A total of seven applications were granted for turbines, totalling 24 turbines, and three applications were refused for a total of 52 turbines.  Of the permissions granted two were extensions of duration.

Three windmasts were granted permission (two being retentions).  One section 5 referral and one pre-application consultation were also determined by to An Bord Pleanála during the year.  Further applications determined and granted related to grid connections, substations and amendments to hardstands.  These decisions are most troubling as they clearly demonstrate the prior wind farm permissions and the necessary assessments were significantly flawed by either failing to include or minimising significant elements from the original applications.  Such project splitting and the unwillingness of An Bord Pleanála to adequately reassess applications under Environmental Impact Assessment laws are a growing concern.

One further point to note is that the continued uncertainty in Donegal in relation to the Wind Energy elements of the County Development Plan, in particular the ongoing court action being take by Cllr. John Campbell is adding to growing community and industry anxiety over wind farm planning in the County; with the issue of zoning and safe setbacks from homes to wind farms remaining in legal and planning limbo.

Note: current live applications for wind farms and ancillary developments in Donegal can be found here, and a link to the wind turbine planning permissions for Donegal in 2014, 2015 are here and here.

The featured image was taken by Matt Britton at a wind farm near Ballyshannon, Co. Donegal – see @britpix on twitter.

Table of wind farm and ancillary development decisions in Donegal 2016

Name

Location Turbines Reference no. Type of App. Status

Decision Date

Carrickaduff Windfarm

Planree Ltd

Between Barnes and Killygordon 49

ABP: PA0040

Full PP REFUSED

25 March 2016

Clogheravaddy Wind Farm Ltd

Frosses 7

DCC: 14/51305

ABP: PL05E.244417

Full PP GRANTED

19 February 2016

Clogheravaddy wind Ltd

Binbane Grid Connection

DCC: 16/50440

Full PP INVALID

6 April 2016

Clogheravaddy wind Ltd

Binbane Grid Connection

DCC: 16/50473

ABP: PL05 .246851

Full PP DCC: Refused

ABP: GRANTED

DCC: 8 June 2016

ABP: 24 Nov 2016

Connective Energy Holdings Ltd

Meenagrauv

Ballybofey

1

DCC: 15/51071

Full PP GRANTED

15 May 2016

Corvin Wind Ltd

Bauville, Inishowen Substation

DCC: 16/51540

Full PP GRANTED

1 December 2016

Cufgaze Limited

Drumnahough and Lenalea Wind Farms to Clogher Substation Substation

&

Grid Connection

ABP: VC0097

Pre-App consultation Is not strategic infrastructure

20 October 2016

Cunard Asset Management

Meenhore

Grousehall

2

DCC: 16/50040

Full PP INVALID

21 January 2016

Cunard Asset Management

Meenhore

Grousehall

2

DCC: 16/50209

Full PP INVALID

11 April 2016

Cunard Asset Management

Meenhore

Grousehall

2

DCC: 16/50209

Full PP REFUSED

15 June 2016

Declan Clarke

Kinnegoe Bay 1

DCC: 15/51683

ABP: PL05.246265

Full PP REFUSED

12 July 2016

Derrykillew Community Windfarm Ltd

Derrykillew

Ballyshannon

5

DCC: 14/51400

ABP: PL05E.245108

Full PP GRANTED

18 March 2016

ESB Networks and EirGrid PLC

Donegal 110kv Alter 110kv line

ABP: PL05.VM0010

Full PP GRANTED

11 May 2016

ESB

Sorn Hill Station & Transformer

DCC: 16/50829

Extend Duration GRANTED

21 July 2016

Gineadóir Gaoith Teoranta

Cronalaght Substation

DCC:15/51726

Amend PP GRANTED

25 February 2016

Gineadior Gaoithe Teo.

Gweedore 5

DCC: 16/50989

ABP: PL05.247194

Amend turbines GRANTED

DCC: 18 August 2016

22 December 2016

Glenalla Green Ltd.

Garrymore

Kerrykeel

1

DCC: 16/50297

Extend duration GRANTED

21 April 2016

Karol McElhinney

Aheavagh, Ballybofey 1

DCC: 16/50540

Extend duration GRANTED

16 June 2016

Lettergull Energy Ltd

Raphoe to Listillion Grid connection

DCC: 15/50968

Full PP GRANTED

18 February 2016

Lir Energy Ltd

Gweedore 1

DCC: 16/51532

Full PP INVALID

20 October 2016

Lir Energy Ltd

Gweedore 1

DCC: 16/51486

Full PP INVALID

12 October 2016

Maas Wind Ltd

Maas 11 Hardstands

DCC: 16/50564

ABP: PL05 .246871

Full PP GRANTED

DCC: 10 June 2016

21 December 2016

Planree Ltd

Cornashesk, Killygordon Wind Mast

DCC: 16/50254

Retention GRANTED

21 April 2016

Planree Ltd

Meenbog, Ballybofey Wind Mast

DCC: 16/50348

Retention GRANTED

21 April 2016

Planree Ltd

Ballyarrell Mountain & Lismulladuff, Killygordan 2 met masts

ABP: PL05E.RL3419

s.5 referral Is development

(Not Exempted)

8 February 2016

Planree Ltd

Meenbog, Ballybofey Wind Mast

DCC: 16/50447

Full PP INVALID

7 April 2016

Planree Ltd

Meenbog

Ballybofey

Wind Mast

DCC: 16/50585

Full PP GRANTED

16 June 2016

proVento Ireland PLC

Tullylinn

Pettigoe

4

DCC: 13/51404

ABP: PL05E.245588

Full PP GranTED

30 August 2016

Advertisements

Irish wind output lows of 2016

2016-wind-low

As 2016 begins to fade into the memory the media will be full of lists of the “highs and lows” from the year.  Each year our blog report of the Irish wind farm output lows for the previous year (see 2014, 2015) is one of the most read posts on our blog, so here are the lows for 2016 (ROI).

As with last year our more traditional media only seem capable of reporting on wind output highs – no doubt the data is churned out of the Irish Wind Energy Association (IWEA) PR department, see for example New records set for wind energy generation across Ireland during Christmas 2016, and subsequent copy and paste articles on Irish Times and NewsTalk.

In order to provide a little balance set out below is a table of the lowest wind output recorded, for the Republic of Ireland, in each of the last twelve months.  The lowest recorded being sustained periods with no output at all in February, May and October and the annual record low falling on 16 May 2016 when wind output was at a sustained recorded level of -3MW (all figures were sourced from EirGrid information webpage).

Month Recorded Output Low Date & Time
January 29 19/01/2016 04:15
February 0 11/02/2016 14:00
March 12 22/03/2016 04:15
April 4 19/04/2016 05:15
May -3 16/05/2016 09:00
June 4 08/06/2016 08:15
July 8 22/07/2016 21:15
August 3 14/08/2016 10:15
September 17 19/09/2016 19:00
October -2 20/10/2016 17:15
November 7 02/11/2016 16:00
December 39 14/12/2016 17:30

For some context for readers in relation to the output figures, according to IWEA the island of Ireland has 249 wind farms (215 in ROI) with an installed capacity of 3,301MW (2,659.116MW in ROI).   Demand on the island of Ireland fluctuates between 2,600MW – 6,100MW but reached a high of 6,878MW in December 2010.  It is clear therefore that wind energy outputs of between 0MW – 39MW (ROI) represent a very poor return for the Republic’s 2,659MW installed capacity.

So, the next time you see a pro-wind advert (remember that unlawfully broadcast JFK Power to Power Ourselves advertisement) or read an IWEA inspired “record Irish wind output” story check back to this page and visit EirGrid’s information page to confirm that despite the spin, the energy produced by wind turbines is unpredictable, intermittent and totally dependent on the backup of conventional fossil fuelled power plants such as those fuelled by gas, oil, coal or peat.


%d bloggers like this: